— Rebar in post-tension

Your detailers should be on tendons.

You do the post-tensioning. The passive steel in the same slab — bursting bars at every anchorage, the transfer section where rebar has to thread past the ducts — lands on the same desks anyway. We detail that half, against your layout, in your title block.

THE HALF THAT ISN’T PT WORK

Your detailing team is a post-tension team. They know drape profiles, stressing sequence, elongation. Then the reinforcement in the same slab arrives, and it goes to the same people — because it is the same drawing.

It is slow work for a PT detailer and it is not what they are for. We take that half of the package so your team stays on the tendons.

Section · tendon profile as reference, passive steel detailed
WHAT WE DETAIL
Anchorage zones
Bursting and spalling reinforcement at live-end and dead-end anchorages, detailed to the zone your design sets.
Transfer slabs and beams
Where heavy passive steel and the tendons share one congested section, and the bars have to find a way past the ducts.
Flat slabs and band-beam floors
The mat, the column zones, and the added steel around banded and distributed layouts.
PT rafts and tanks
The reinforcement through thick sections, where lap and coupler positions are set as much by the tendons as by the bars.
Bar bending schedules
Shape codes to BS 8666 or ACI, quantities the machine software takes without retyping — coordinated against your tendon layout so the yard doesn’t cut steel that won’t fit.
Anchorage zone · anchor and duct theirs, bursting steel ours
WHAT STAYS YOURS

The tendon layout. Drape profiles, force and elongation, stressing sequence, the system — that is your design and your specialism. It reaches us as the underlay we detail against. We don’t produce it, we don’t reissue it, and we don’t second-guess your engineer.

Where the reinforcement can’t build as the layout is drawn, you get the section marked and a note back — not a silent rework. Revisions run through us, in your title block and your bar-mark conventions, so your engineers stay on design instead of drafting.

Clash clouded and flagged back · the layout is untouched
PROOF

Post-tensioned podium slabs and transfer structures on Vision 2030 projects across KSA and the UAE — anchorage-zone reinforcement, the passive steel through congested transfer sections, BBS coordinated against the tendon layout. Client and project names are stripped; the scope reads true to anyone who has detailed around PT.

THE SAMPLE

Send one level — the deck where the bursting bars fight the anchorages, the transfer level nobody has hours for. We detail a portion and return the drawings and schedules for your own checkers to read.

Your files stay your files; no commitment.

ONE PACKAGE · DRAWINGS AND BBS TO KEEP